top of page

ABATEMENT

2.png

Most buildings constructed prior to January 1, 1981 were comprised of existing surfacing materials (drywall, plaster, acoustical and finish textures, etc.) and thermal system insulation presumed to contain asbestos unless sampled by a licensed inspector. Buildings constructed after January 1, 1981 may still require an inspection or documentation that asbestos containing materials (ACM) were not used during construction (blue-prints ,building records, safety data sheets, etc.).

 

We provide proven removal, remediation and encapsulation services in addition to long term facility maintenance contracts with educational, commercial, and industrial facilities throughout Chicago and its surroundings. Our abatement capabilities include components such as piping, boilers, equipment, and interior finishes. nviro utilizes proper equipment and confinement techniques to safely remove building materials.

 

The nviro team is state-licensed and trained in all aspects of the asbestos industry. We employ best practice methods using state of the art equipment to perform our tasks in a safe, efficient, and cost-effective fashion. Upon conclusion we will provide a full report outlining scope of work, findings, recommendations when required and independent lab results nviro’s abatement / remediation management services include:

 

  • Project Design and Management Planning

  • Scope of Work Development for Mold Remediation

  • Remediation Monitoring and Documentation

  • Project Management, Monitoring & Supervision

Asbestos Workers
bottom of page